title: OIF OKR-O1 Cross-Week Execution Workspace
type: okr-execution-workspace
summary: Cross-week OIF OKR-O1 execution workspace. Daily updates are the primary input; weekly plans, gaps, summaries, evidence, decisions, and dev log are accumulated until the OIF project ends.
status: active
updated: 2026-05-05
lang: zh-hant
translation_key: analyses/oif-okr-o1-execution-workspace
topic: oif
sources:
  - analyses/oif-weekly-execution-review
  - syntheses/oif-wig-progress-dashboard
  - https://developers.tron.network/reference/get-transaction-info-by-id
  - https://hyperliquid.gitbook.io/hyperliquid-docs/for-developers/hyperevm
tags:
  - llm-wiki
  - analysis
  - oif
  - weekly-review
  - okr-o1
  - cross-week
---

# OIF OKR-O1 Cross-Week Execution Workspace

本文件的設計目標是讓 `Daily Updates` 成為唯一主要輸入來源，並在 OIF 專案期間跨週累積週計畫、任務進度、gap、建議、週總結、evidence、decision 與 dev log。

## OKR Context

| Field | Value |
|---|---|
| Project | OIF |
| OKR | OKR-O1 |
| Current Week | W19 |
| Current Health | 🟢 `Strong Progress candidate` |
| Active Weekly P0 | `HyperEVM -> TRON` direction closure |
| Cross-week Rule | 週工作流每週重開；Evidence / Decision / Dev Log 跨週累積直到 OIF 專案結束 |

## Navigation

這份 Markdown 先用清楚章節模擬分頁；後續若要做成 HTML / dashboard，可以直接將每個 `Tab` 轉成一個分頁。

| Tab | Purpose | Update Frequency |
|---|---|---|
| [Tab 1. Current Week Plan](#tab-1-current-week-plan) | 目前週要攻克的任務、優先級、完成條件與最新狀態 | 週初建立，每日微調 |
| [Tab 2. Daily Updates](#tab-2-daily-updates) | 每日團隊更新，作為唯一主要輸入 | 每日更新 |
| [Tab 3. Gap Analysis](#tab-3-gap-analysis) | 對照目前週 plan，找出進度、證據、阻塞與 scope gap | 每日更新後刷新 |
| [Tab 4. Weekly Summary](#tab-4-weekly-summary) | 目前週總結草稿與 progress rating | 每日更新後刷新，週末定稿 |
| [Cross-week A. Dev Log](#cross-week-a-dev-log) | 跨週累積工程脈絡、route 變化、debug 與重要發現 | 有新事件時補 |
| [Cross-week B. Week Archive](#cross-week-b-week-archive) | 每週定稿與 carry-over 紀錄 | 每週結束時更新 |
| [Support A. Evidence Log](#support-a-evidence-log) | tx、block、timestamp、balance、parser、成本等支撐證據 | 有新證據時補 |
| [Support B. Decision Log](#support-b-decision-log) | 跨週關鍵判斷、scope change、priority change | 有決策時補 |
| [Support C. Rubric](#support-c-rubric) | 評級標準與 checklist | 週初建立，必要時調整 |

## Daily Refresh Workflow

每天只需要先填 `Tab 2. Daily Updates`，再依序刷新其他分頁。

1. 將團隊日更新貼到 `Raw Update`。
2. 把可驗證材料補到 `Evidence`，例如 tx、PR、log、issue、test result。
3. 更新 `Tab 1. Current Week Plan` 的 task status、latest update、evidence、next action。
4. 更新 `Tab 3. Gap Analysis`，標記 missing evidence、blocked item、scope drift、priority conflict。
5. 更新 `Tab 4. Weekly Summary` 的本週結論與 next-week recommendation。

## Daily Auto-Refresh Rules

每天貼入日更新後，依以下規則刷新 task、gap、健康度與週總結。

### Task Refresh Rules

| Signal | Update Rule |
|---|---|
| 日更新明確提到 task ID 或 route / contract / relayer / cost 等關鍵字 | 更新對應 task 的 `Latest Update` |
| 有 tx / PR / log / test result / block / timestamp | 補入 `Evidence`，可視完成度調整 status |
| 只有口頭進展但無證據 | status 最多維持 `In Progress`，並標記 `Evidence Missing` |
| 明確出現 blocker / failed / regression / waiting | 對應 task 標記 `Blocked` 或新增 gap |
| task 完成 single-run，但尚未重跑或產品化 | 使用 `Done for single-run`，不直接升為 `Done` |

### Gap Refresh Rules

| Condition | Gap Type |
|---|---|
| P0 / P1 任務有進展但沒有 evidence | `Evidence Missing` |
| 日更新提到卡住、失敗、waiting、regression | `Blocked` 或 `Regression Risk` |
| 合約裁剪可能影響反向 PoC path | `Regression Risk` |
| 更新內容偏離 W19 P0 / P1 | `Scope Drift` |
| IGP / relayer / fee / gas 缺細節 | `Evidence Missing` for cost / relayer model |

### Health Refresh Rules

| Health | Meaning | Typical Condition |
|---|---|---|
| 🔴 | 進度高風險 | P0 regression、反向 route 無法推進、核心 blocker 未定位 |
| 🟡 | 中等進展 | 有單方向 evidence，但另一方向未跑通且 blocker 未定位 |
| 🟢 | 健康推進中 | P0 有明確推進、證據補強或 blocker 已可排程處理 |
| 🌟 | 可進入下一階段 | 雙向 testnet PoC 已走通，且 evidence 足以支撐進入 repeatability / cost model / readiness |

### Weekly Summary Refresh Rules

- 若今日有 verified evidence，補進 `What Changed This Week`。
- 若今日有 P0 outcome，更新 `P0 Outcome`。
- 若今日有 scope / priority 改變，補進 `Decision Log`。
- 若今日有 blocker，補進 `Blockers / Risks`，並給出 next action。
- 若今日健康度變化，更新 weekly rating 與理由。

## Weekly Rollover Workflow

當 W19 結束並進入 W20 時，不建立全新專案檔；在同一個 OKR workspace 下開新週，保留跨週 log。

1. 定稿上一週 `Weekly Summary`。
2. 將上一週移入 `Week Archive`。
3. 將未完成項目分類為 `Carry-over`、`Deferred`、`Dropped` 或 `Done`。
4. 用 `Carry-over` 產生新週 `Current Week Plan`。
5. 新週 `Daily Updates` 從空白開始。
6. `Evidence Log`、`Decision Log`、`Dev Log` 保留跨週累積。

### Week Rollover Template

```md
## W20 Bootstrap

### Source

- Derived from: W19 Final Summary

### Carry-over From W19

| Previous Task | W20 Task | Priority | Reason | Success Criteria |
|---|---|---|---|---|
|  |  |  |  |  |

### W20 Initial Health

- Health:
- Reason:

### W20 P0

- 
```

---

## Tab 1. Current Week Plan

### W19 Objective

W19 的核心目標是完成 OIF testnet PoC route feasibility 驗證：在 `TRON Shasta <-> HyperEVM testnet` 兩個方向上，至少跑出 single-run route evidence，或明確定位反向 route blocker。

### Current Weekly Rating

- Current rating: `Strong Progress candidate`
- Reason: `TRON Shasta -> HyperEVM testnet` 已有 open / fill / post-fill / claim single-run evidence，並已補 balance-change verification；但 `HyperEVM -> TRON` 尚未閉環。
- Upgrade gate: `HyperEVM -> TRON` 跑出 single-run tx evidence，或反向 blocker 已被清楚定位且可排程處理。

### Task Board

| ID | Task | Priority | Owner | Success Criteria | Status | Latest Update | Evidence | Next Action |
|---|---|---|---|---|---|---|---|---|
| W19-P0-01 | TRON Testnet -> HyperEVM Testnet `open -> claim` e2e 打通 | P0 | TBD | open / fill / post-fill / claim tx confirmed；timestamp、actor、balance change 可對齊 | Done for single-run | 2026-05-04 已確認 single-run verified | 見 [Route Evidence](#route-evidence) 與 [Balance Verification](#balance-verification) | Freeze baseline；若合約裁剪後有時間，重跑 regression check |
| W19-P0-02 | HyperEVM Testnet -> TRON Testnet `open -> claim` e2e 打通 | P0 | TBD | 跑出反向 open / fill / post-fill / claim single-run tx evidence，或明確定位 blocker | In Progress | 2026-05-04 確認為下一個主要 PoC 目標 | TBD | 拆最小 e2e path，確認 Hyperlane message direction、TRON fill / claim path 與 solver state transition |
| W19-P1-01 | Solver 支援無 Permit2、無 EIP-3009 token：`approve + transfer` | P1 | TBD | 定義 TRON source-chain token capability constraint 下的 route scheme | Not Started | 已列入 W19 item | TBD | 決定 approve-only subset、ERC-3009、或 upstream parity strategy |
| W19-P1-02 | TRON 版本 OIF 合約移除不必要功能/邏輯 | P1 | TBD | 裁剪完成，且不破壞 `HyperEVM -> TRON` PoC 所需 path、event、guard、ABI | In Progress | 2026-05-04 已安排單人負責 | TBD | 裁剪前 freeze baseline；裁剪時保留反向 PoC 所需 call path |
| W19-P1-03 | 根據內部 OIF workflow tuning 自建 testnet Hyperlane relayer | P1 | TBD | 降低 relayer latency / failure uncertainty，或判斷暫不需要自建 | Not Started | 已列入 W19 item | TBD | 先釐清 post-fill / IGP / proof path 是否已足夠穩定 |
| W19-P1-04 | 研究 Hyperlane IGP 如何定價 | P1 | TBD | 拆出 per-route gas payment / relayer cost 的估算方法 | Not Started | 已列入 W19 item | TBD | 補 post-fill transaction 的 IGP / relayer payment 細節 |
| W19-P2-01 | 研究 OIF solvers 對 `n tokens -> n tokens` 的支持 | P2 | TBD | 判斷是否進入後續 scope，不阻塞 W19 PoC | Not Started | 保留為後續研究 | TBD | 延後到 route feasibility 穩定後 |
| W19-P2-02 | e2e 打通後的成本匯總實算 | P2 | TBD | 彙總 TRON fee、HyperEVM gas、IGP、relayer cost | Not Started | 尚未完整拆分成本 | 部分 tx fee 已有 | 先完成 route evidence，再補完整成本模型 |
| W19-P2-03 | Solver waiting root-cause trace | P2 | TBD | 補一筆 tx 已上鏈但 solver 仍 waiting 的具體案例與 log | Not Started | 2026-05-04 團隊回報 solver multi-process waiting 問題 | TBD | 找一筆具體案例，記錄 process、state、tx hash、waiting duration |

### Status Rules

| Status | Meaning |
|---|---|
| Not Started | 任務已列入 W19，但尚無每日更新或證據 |
| In Progress | 有明確行動或 owner，但未達 success criteria |
| Blocked | 有明確阻塞，且需要決策、協助或外部依賴 |
| Done for single-run | 單次 PoC 證據完成，但 repeatability 尚未完成 |
| Done | 達成本週定義的 success criteria |
| Deferred | 有意識延後，不作為 W19 gate |

---

## Tab 2. Daily Updates

### Daily Update Template

複製以下模板到每天的新日期下。`Raw Update` 保留團隊原話或接近原話；判讀放到 `Interpretation` 與 `Tab 3. Gap Analysis`。

```md
### YYYY-MM-DD Day

#### Raw Update

- 

#### Evidence

| Evidence | Related Task | Link / Ref | Notes |
|---|---|---|---|
|  |  |  |  |

#### Blockers

- 

#### Tomorrow Focus

- 

#### Interpretation

- 
```

### 2026-05-04 Mon

#### Raw Update

- 已走通 TRON -> HyperEVM single-run e2e。
- Balance change 已確認 settlement 閉環。
- 目前 PoC P0 改為 HyperEVM -> TRON。
- 合約裁剪列 P1，單人負責完成。
- 下一步：拆反向最小 e2e path。

#### Evidence

| Evidence | Related Task | Link / Ref | Notes |
|---|---|---|---|
| TRON -> HyperEVM open / fill / post-fill / claim tx evidence | W19-P0-01 | 見 [Route Evidence](#route-evidence) | 四筆 tx confirmed |
| Balance change verification | W19-P0-01 | 見 [Balance Verification](#balance-verification) | 3799.7 -> 3789.7 -> 3799.7 USDT |

#### Blockers

- Solver 穩定性不足。因為 multi-process 行為，不時出現交易已經上鏈，但 solver 仍停在 waiting 狀態。此問題將列入排查，但目前不妨礙走通 e2e flow。
- `HyperEVM -> TRON` 尚未跑出 single-run evidence。
- 合約裁剪需避免破壞下一方向 PoC 所需功能。

#### Tomorrow Focus

- 拆 `HyperEVM -> TRON` 最小 e2e path。
- 合約裁剪時保留 `HyperEVM -> TRON` 所需 function、event、guard 與 solver call path。
- Freeze `TRON -> HyperEVM` 成功 baseline，作為後續 regression reference。

#### Interpretation

- W19 的 PoC 目標應定義為 route feasibility：先證明兩個方向都可以走通，而不是先把單一方向變成可復用服務。
- Solver waiting after on-chain success 不應視為 e2e feasibility blocker；它是後續 reliability blocker，但不是當前 P0。
- 合約裁剪是合理收斂方向，且已成為 W19 committed workstream；它不是最高優先級，但應由單人 owner 推進到完成。
- 目前主要工作重心應從 `TRON -> HyperEVM` single-run success，轉向 `HyperEVM -> TRON` direction closure。

---

## Tab 3. Gap Analysis

### Gap Types

| Gap Type | Meaning | Typical Action |
|---|---|---|
| No Update | 計畫內任務沒有每日進展 | 明確是否仍在本週 scope |
| Evidence Missing | 有口頭進展，但缺 tx、log、PR、test result 等證據 | 補 evidence 或標記為 unverified |
| Blocked | 有明確阻塞 | 指派 owner、決策或下一步排查 |
| Scope Drift | 每日工作偏離 W19 P0 / P1 | 調整 priority 或記錄 scope change |
| Priority Conflict | 實際投入與 priority 不一致 | 重排資源或降低非核心任務 |
| Regression Risk | 新工作可能破壞已完成路徑 | Freeze baseline，定義 acceptance check |

### Current Gap Snapshot

| Date | Related Task | Gap Type | Gap | Impact | Suggested Action | Status |
|---|---|---|---|---|---|---|
| 2026-05-04 | W19-P0-02 | Evidence Missing | `HyperEVM -> TRON` 尚未有 single-run tx evidence | W19 尚不能判定雙向 route feasibility 完成 | 拆最小 e2e path，先跑出 open / fill / post-fill / claim 任一完整證據鏈，或定位 blocker | Open |
| 2026-05-04 | W19-P1-02 | Regression Risk | 合約裁剪可能移除反向 PoC 所需 function、event、guard、ABI 或 solver call path | 可能影響 W19-P0-02 | 裁剪前 freeze W19-P0-01 baseline；裁剪 checklist 必須包含反向 PoC path | Open |
| 2026-05-04 | W19-P2-03 | Blocked | Solver waiting 問題尚無具體案例與 log | 會影響後續 repeatability，但不是當前 route feasibility gate | 找一筆 tx 已上鏈但 solver waiting 的案例，記錄 process、state、tx hash、duration | Deferred |
| 2026-05-04 | W19-P1-04 / W19-P2-02 | Evidence Missing | post-fill 的 IGP / proof / relayer payment 細節尚未補齊 | 成本模型與 relayer decision 仍不完整 | 先補 post-fill tx 對應的 payment / proof / relayer evidence | Open |
| 2026-05-04 | W19-P0-01 | Evidence Missing | order ID 與 parser output 尚未補齊 | single-run 成功已成立，但 evidence chain 尚未完整自動化 | 補 order ID、Open / Filled / PostFill / Claimed parser output | Open |

### Today / Tomorrow Recommendations

#### P0

- 將下一個 PoC 目標明確定義為 `HyperEVM -> TRON` direction closure。
- 拆解 `HyperEVM -> TRON` 的最小 e2e path：
  - HyperEVM testnet open
  - TRON Shasta fill
  - TRON / Hyperlane post-fill or proof path
  - HyperEVM testnet claim
- 確認 `HyperEVM -> TRON` 方向與已走通的 `TRON -> HyperEVM` 方向有哪些差異：
  - source-chain token capability
  - destination settlement contract
  - Hyperlane message direction
  - proof / IGP / relayer flow
  - solver state transition
- 合約裁剪時優先保留 `HyperEVM -> TRON` PoC 所需功能，避免裁掉下一方向會用到的 call path、event 或 guard。

#### P1

- 合約裁剪由單人 owner 持續推進，目標是在不破壞 PoC 所需路徑的前提下移除不必要功能。
- 在合約裁剪前 freeze 目前成功 `TRON -> HyperEVM` e2e baseline，作為 fallback evidence。
- 合約裁剪後若時間允許，重跑既有 `TRON -> HyperEVM` path，確認沒有明顯 regression。
- 補 order ID，建立同一 order 的 end-to-end evidence chain。
- 補 event parser output，至少覆蓋 `Open`、`Filled`、`PostFill` / proof、`Claimed`。

#### P2

- 找一筆「tx 已上鏈但 solver 仍 waiting」的具體案例做 root-cause trace，作為後續 reliability hardening 的輸入。
- 補 post-fill 的 IGP / proof / relayer payment 細節，避免 post-fill success 與成本模型脫節。
- `n tokens -> n tokens` solver support 研究可保留，但不應壓過 solver stability、contract trimming regression 與 acceptance test。

---

## Tab 4. Weekly Summary

### Weekly Summary Draft

- W19 current rating: `Strong Progress candidate`
- Main conclusion: `TRON Shasta -> HyperEVM testnet` 已完成 open / fill / post-fill / claim 的 single-run testnet lifecycle evidence，並補上 balance-change verification，因此 W18 的 claim blocker 已在該路徑上解除。
- Current P0: `HyperEVM -> TRON` direction closure。
- Current P1 committed workstream: TRON OIF 合約裁剪，且不得破壞反向 PoC 所需功能。
- Main open gaps:
  - `HyperEVM -> TRON` 尚無 single-run evidence。
  - order ID / event parser output 尚未補齊。
  - post-fill 的 IGP / proof / relayer payment 細節尚未補齊。
  - solver waiting issue 尚未有具體 root-cause trace。
- Strategic judgment: Continue with Adjust。

### Weekly Review Template

```md
## W19 Weekly Review

### Progress Rating

- Rating:
- Reason:

### What Changed This Week

- 

### P0 Outcome

| Task | Outcome | Evidence | Remaining Gap |
|---|---|---|---|
|  |  |  |  |

### P1 Outcome

| Task | Outcome | Evidence | Remaining Gap |
|---|---|---|---|
|  |  |  |  |

### Blockers / Risks

- 

### Decision / Scope Changes

- 

### Next Week Recommendation

- 
```

### Suggested Weekly Review Wording

W19 Mon provides the first verified single-run full testnet lifecycle evidence for the TRON Shasta -> HyperEVM testnet OIF route: open, fill, post-fill, and claim transactions were confirmed successful, with 13s from open to fill and 54s from open to claim based on script timing that matches chain timestamps. Balance-change verification shows the source / recipient balance moved from 3799.7 USDT to 3789.7 USDT after open and returned to 3799.7 USDT after fill / claim. This directly resolves the W18 claim blocker for the tested path. Because the current phase is PoC, the next W19 focus should shift to `HyperEVM -> TRON` direction closure rather than production-grade repeatability. Contract trimming is a P1 committed workstream with a single owner and should be completed without consuming route-closure resources. Solver waiting and repeatability remain important follow-up reliability items, but they should not displace the current P0 of proving the reverse direction. The progress should be treated as a Strong Progress candidate until both directions have single-run route evidence or the reverse-direction blocker is clearly identified.

---

## Cross-week A. Dev Log

Dev Log 用於跨週累積 OIF 專案的工程脈絡。每筆紀錄應保留週次、日期、事件類型、證據與後續影響。

| Week | Date | Type | Log | Evidence / Ref | Follow-up Impact |
|---|---|---|---|---|---|
| W19 | 2026-05-04 | Route evidence | `TRON -> HyperEVM` 單次 open / fill / post-fill / claim 已驗證 | 見 [Route Evidence](#route-evidence) 與 [Balance Verification](#balance-verification) | W19 P0 轉向 `HyperEVM -> TRON` 方向閉環 |
| W19 | 2026-05-04 | Decision | PoC 目前優先證明 route feasibility，而非 production-grade repeatability | 見 [Decision Log](#support-b-decision-log) | Solver waiting 降為後續 reliability item |

### Dev Log Entry Template

| Week | Date | Type | Log | Evidence / Ref | Follow-up Impact |
|---|---|---|---|---|---|
| W20 | YYYY-MM-DD | Route / Contract / Solver / Relayer / Cost / Decision |  |  |  |

---

## Cross-week B. Week Archive

每週結束後，將該週定稿摘要移入 archive，並把未完成事項分類為 carry-over / deferred / dropped / done。

| Week | Status | Health | Final Summary | Carry-over |
|---|---|---|---|---|
| W19 | Active | 🟢 `Strong Progress candidate` | `TRON -> HyperEVM` 單次 lifecycle evidence 已完成；反向 route 尚待閉環 | `HyperEVM -> TRON`、合約裁剪、event parser、IGP / cost、solver waiting trace |
| W20 | Planned | TBD | 由 W19 final summary 產生 | 待 W19 週總結定稿後建立 |

### Carry-over Classification

| Classification | Meaning |
|---|---|
| Carry-over | 仍是下一週 P0 / P1，需要延續 |
| Deferred | 有價值但不阻塞下一週主線 |
| Dropped | 不再符合目前 OKR scope |
| Done | 已達本週 success criteria |

---

## Support A. Evidence Log

### Route Evidence

#### Time Consumed

| Metric | Value | Measurement Source | Confidence | Notes |
|---|---:|---|---|---|
| `open -> fill` | 13s | script timing on Shasta run; matches chain timestamp delta | Confirmed | open at 2026-04-30 09:25:45 UTC; fill at 2026-04-30 09:25:58 UTC |
| `open -> claim` | 54s | script timing on Shasta run; matches chain timestamp delta | Confirmed | open at 2026-04-30 09:25:45 UTC; claim at 2026-04-30 09:26:39 UTC |

#### System Flow

| Step | Chain / Network | Transaction | Status | Actor | Timestamp / Block | Evidence Notes |
|---|---|---|---|---|---|---|
| open | TRON Shasta | [`0xe162...79f10`](https://shasta.tronscan.org/#/transaction/e162f15cd2780bf0440cdeb3a61a80592951b9d4af9175e969d3aaf404e79f10) | confirmed `SUCCESS` | user | block `64466891`; 2026-04-30 09:25:45 UTC | TronGrid receipt: fee `12.469540 TRX`, energy usage `54374`, transfer / approval / open logs present |
| fill | HyperEVM testnet | [`0x2a2a...c8dd`](https://testnet.purrsec.com/tx/0x2a2a1940fc99e6620d3ee6d06b8e37bc34ba3a939e9c3869c71466be40c0c8dd) | confirmed `status=0x1` | solver | block `52244803`; 2026-04-30 09:25:58 UTC | RPC receipt: gas used `81822`, from `0xe3c19b...c1e0`, to `0xe241df...bc60`, fill-related logs present |
| post fill | HyperEVM testnet | [`0x7dbb...8acf`](https://testnet.purrsec.com/tx/0x7dbb13bb8a8b1e96396283de40a67dfd380c914f997ad6a3f55f337eec598acf) | confirmed `status=0x1` | solver | block `52244824`; 2026-04-30 09:26:18 UTC | Confirmed as solver automatic flow; RPC receipt gas used `93852`, from `0xe3c19b...c1e0`, to `0x3db867...cf73`, post-fill logs present |
| claim | TRON Shasta | [`0xc9f6...cab0`](https://shasta.tronscan.org/#/transaction/c9f67224941588cad3120a2475d34028efda727b47c21da3423ad85e91a3cab0) | confirmed `SUCCESS` | solver | block `64466909`; 2026-04-30 09:26:39 UTC | TronGrid receipt: fee `7.199050 TRX`, energy usage `28205`, transfer / claim logs present |

### Balance Verification

| Scope | Address / Entity | Before | After Open | After Fill / Claim | Assessment |
|---|---|---:|---:|---:|---|
| TRON Shasta source / recipient balance | `TWjUKfB5VXE1Dp4bcSwMGhvFPY4iqnRM8e` | 3799.7 USDT | 3789.7 USDT | 3799.7 USDT | Balance decreases by 10 USDT after open and returns to the original level after fill / claim, supporting source-side settlement completion. |

### Verification Notes

- TRON Shasta tx metadata 透過 TronGrid `walletsolidity/gettransactioninfobyid` 查得。
- HyperEVM testnet tx metadata 透過 Hyperliquid official testnet RPC `eth_getTransactionReceipt` 查得。
- 鏈上 timestamp 與 script timing 一致：`open -> fill = 13s`，`open -> claim = 54s`。
- 目前已確認 transaction success、block number、timestamp、actor attribution、post-fill solver automation 與 balance-change verification。
- 目前 PoC 下一個主要缺口是 `HyperEVM -> TRON` direction 尚未閉環。
- 尚未補齊的是 order-level parser output、repeatability 與完整成本拆分；這些是後續強化項，不作為當前 PoC P0 gate。

---

## Support B. Decision Log

| Date | Decision | Reason | Impact |
|---|---|---|---|
| 2026-05-04 | W19 PoC 目標定義為 route feasibility，而非 production-grade repeatability | 目前階段要先證明路徑可行，避免過早投入可靠性工程 | Solver waiting 降為後續 reliability item，不阻塞當前 P0 |
| 2026-05-04 | 下一個 P0 改為 `HyperEVM -> TRON` direction closure | `TRON -> HyperEVM` 已有 single-run evidence，雙向 feasibility 尚未完成 | 團隊重心轉向反向最小 e2e path |
| 2026-05-04 | 合約裁剪列為 P1 committed workstream | 裁剪可收斂 PoC scope，且已安排單人負責 | 需避免破壞 `HyperEVM -> TRON` PoC 所需功能 |

---

## Support C. Rubric

### W18 Baseline

- Week: W18
- W18 progress rating: `Moderate Progress`
- W18 core state: testnet 已完成 `open`、`fill` 與 `submitProof`，但 `claim` 仍未完成，因此完整 OIF settlement lifecycle 尚未閉環。
- W18 Priority 1: 在 Shasta / HyperEVM testnet 上完成 `claim`，關閉 `open -> fill -> submitProof -> claim/refund` route lifecycle。

### W18 Blocker Resolution Check

| W18 Blocker | W19 Evidence | Assessment | Follow-up |
|---|---|---|---|
| `Claim` 未完成 | TRON Shasta claim tx 已確認 `SUCCESS`，block `64466909`，且已補 recipient / escrow balance change | Resolved for this single-run testnet flow | 重跑確認 repeatability |
| `PostFillReady` / gas payment quote 風險 | HyperEVM testnet post fill tx 已確認 `status=0x1`，且為 solver 自動流程 | Resolved for this run; operational repeatability still open | 補 IGP / proof / relayer payment 細節 |
| TRON event parsing mismatch | TronGrid receipts 有 open / claim logs，但尚未補 order ID 與 parser output | Partially resolved as raw evidence; parser automation unresolved | 補 order ID、Open / Claimed / Refunded event parsing evidence |
| Permit2 / EIP-3009 assumptions | 團隊 W19 item 包含 `approve + transfer` | TODO | 決定 approve-only subset、ERC-3009、或 upstream parity strategy |
| WIG success criteria missing | W19 objective 已初步收斂為 route feasibility | Partially resolved | 在 W19 review 前補正式 WIG objective、target networks、acceptance criteria |
| Solver waiting after on-chain tx | 團隊回報 multi-process solver 不時出現 tx 已上鏈但 solver 仍 waiting | Reliability blocker for reuse, but not current PoC P0 | 保留案例與 logs，後續 reliability hardening 再系統性處理 |
| Contract trimming committed workstream | 2026-05-04 開始裁剪 TRON OIF 合約不必要功能，單人負責 | P1 committed workstream; also a PoC scope-management risk | 完成裁剪，並確認不裁掉 `HyperEVM -> TRON` PoC 所需功能 |
| `HyperEVM -> TRON` direction not yet closed | 下一個 PoC 目標 | Current P0 | 拆解最小 e2e path 並跑出 single-run tx evidence |

### Evidence Completeness Checklist

- [x] 四筆 transaction 都已 confirmed。
- [x] 每筆 transaction 都有 block number 與 timestamp。
- [x] 已確認 `open -> fill` 與 `open -> claim` 的量測方法。
- [x] 已確認 `claim` 是 solver 自動執行、script 觸發，或手動觸發。
- [x] 已確認 `post fill` 是 solver 自動流程。
- [ ] 已確認 `post fill` 是否包含 Hyperlane proof、gas payment、IGP 或 relayer action 的成本細節。
- [ ] 已取得 order ID。
- [ ] 已取得 `Open`、`Filled`、`PostFill` / proof、`Claimed` event 或等價證據。
- [x] 已確認 source / recipient balance changes。
- [ ] 已至少重跑第二次，或明確標註目前是 single-run evidence。
- [ ] 已拆分成本：TRON fee、HyperEVM gas、Hyperlane IGP、relayer cost、其他 operational cost。
- [ ] 已定義 `HyperEVM -> TRON` 最小 e2e path。
- [ ] 已跑出 `HyperEVM -> TRON` single-run tx evidence，或明確定位 blocker。
- [ ] 合約裁剪已完成。
- [ ] 合約裁剪已確認不移除 `HyperEVM -> TRON` PoC 所需功能。
- [ ] 已補一筆 solver waiting root-cause trace。
- [ ] 合約裁剪前 baseline 已 freeze。
- [ ] 合約裁剪後已重跑 e2e acceptance path。

### Progress Rating Rubric

| Rating | Criteria |
|---|---|
| `Weak Progress` | 只有局部 tx 或研究輸入，未推進 W18 claim blocker。 |
| `Moderate Progress` | 有單一方向 open / fill / post-fill / claim 的 single-run 證據，但另一方向尚未跑通或 blocker 尚未定位。 |
| `Strong Progress` | `TRON -> HyperEVM` 與 `HyperEVM -> TRON` 都有 single-run route evidence，或反向 blocker 已清楚定位且可排程處理。 |
| `WIG Achieved / Ready for Next Stage` | 雙向 testnet PoC 已走通，且具備足夠 evidence 支持進入 repeatability、cost model、mainnet readiness 或 productization。 |